    The Mission had set an ambitious target of installing 20 GW of grid connected solar power by 2022 to reduce solar power generation in the country through:

    • Long term policy
    • Large scale deployment goals
    • Aggressive R&D
    • Domestic production of critical raw materials, components and products

    The aim of the Mission was to create an enabling policy framework to achieve this objective.